Building Maintenance and Facility Management
Planned maintenance, rapid response, high efficiency: maintenance and technical survey solutions.
Yeşilyurt Group provides comprehensive maintenance, repair and technical survey services for homes, villas, housing estates, business centres, shopping centres, public buildings and commercial facilities. With our expert technical teams, engineers and field personnel, we analyse the technical condition of buildings and develop sustainable, safe and economical solutions.
Through periodic maintenance, fault management, inspection of mechanical and electrical systems, and renovation and refurbishment works, we aim to increase the performance and service life of buildings. Within the scope of our technical survey services, current-condition analyses, technical reporting, valuation processes and risk assessments of buildings are carried out with a professional approach.
Our services cover electrical maintenance (transformers, panels, lighting, fire detection systems), mechanical maintenance (chillers, boilers, VRF/VRV, booster systems), air conditioning and ventilation, building maintenance and repair (roofs, façades, waterproofing, painting and decorating), industrial equipment maintenance (lifts, escalators, cold room systems), camera and low-current systems (IP cameras, CCTV, network, alarm), as well as 24/7 technical support and fault management.
Thanks to the QR Code Fixed-Asset Management System we have developed, all equipment, machinery and fixed assets in buildings, facilities and businesses are tracked digitally; maintenance histories, warranty periods, technical documents and periodic inspection dates are managed through a single system, increasing operational efficiency and minimising maintenance costs. By combining technology with field experience, we deliver long-term value to our clients through rapid response, effective tracking and transparent reporting.
Planned Maintenance for Homes, Residences and Commercial Buildings
We keep residential complexes, villas, offices and commercial buildings running with scheduled maintenance plans. Every asset is tagged in our QR tracking system, so its service history and next inspection date are always on record — useful for owners who manage property from abroad.
Scheduled Maintenance
Electrical panels, lighting, pumps, boilers and HVAC checked on a fixed calendar.
Roof, Façade and Waterproofing
Roof repairs, waterproofing, façade repairs and repainting.
24/7 Fault Response
Round-the-clock fault logging, prioritised dispatch and written reports.
Condition Surveys
Technical condition reports and risk assessments for buildings.
Frequently Asked Questions
Can you look after my property while I live abroad?
Yes. We combine periodic inspections, maintenance and repair coordination with reports so you always know the condition of your property.
Our Process
Discovery & Analysis
Planning & Proposal
Execution & Supervision
Delivery & Support
The Values that Define Us
- Reliability — With more than 30 years of industry experience dating back to 1995, we deliver every project we undertake on time and in full.
- Transparency — With a transparent, dependable and client-focused approach to service, we stand beside you at every stage of process, budget and schedule planning.
- Integrated Service — From turnkey project and execution management to real estate investment advisory, we manage legal, technical and commercial processes under one roof.