Renovation Company in Istanbul — Turnkey Interiors
Imagine it, let us design it, let us transform it: turnkey renovation and refurbishment services.
Yeşilyurt Group provides professional renovation and architecture services that redesign living and working spaces with an understanding of aesthetics, functionality and quality. With our expert staff of experienced architects, interior architects, engineers and installation teams, we produce turnkey solutions for homes, villas, offices, business centres, shops and commercial spaces.
From the design stage through to execution and handover, every stage of the work is planned meticulously, and client expectations are brought together with modern architectural approaches and an innovative design philosophy. We provide services to high quality standards in interior and exterior design, renovation works, decoration solutions and the creation of functional living spaces.
Our services cover fine works (plaster, render, partition walls, plasterboard, glass partitions), painting and decoration (interior/exterior façade paint, decorative paint, epoxy coating), flooring works (ceramic, parquet, PVC, marble and granite), ceilings and façades (suspended ceilings, thermal cladding, façade cladding, insulation), mechanical and electrical works (electrical installation, lighting, air conditioning and ventilation, plumbing, fire systems), furniture and interior fit-out (kitchens, TV units, door manufacturing, bathroom cabinets), and camera and low-current systems (IP cameras, CCTV, network infrastructure, alarm systems).
Thanks to our strong supply network, professional site management and detail-oriented execution approach, renovation projects for homes, villas, offices, shops and business centres are completed on time, within budget and in full. By combining aesthetic values with technical expertise, we add value to your living spaces.
Renovating a Property in Istanbul, Even from Abroad
Many of our renovation clients live outside Turkey. Our architects, interior designers and site teams handle design, material sourcing, all trades and final cleaning under a single contract, and keep you updated with photos and progress reports until the keys are handed back. We also deliver fit-out and renovation projects in Germany, the Netherlands and other European countries, with interiors produced in Turkey.
Full Apartment Renovation
Plastering, painting, flooring, electrics and plumbing, delivered turnkey.
Kitchens and Bathrooms
Cabinetry, worktops, tiling, sanitaryware and services renewed together.
Villa and Waterfront Homes
Interior and exterior renovation, façade, insulation and restoration-sensitive work.
Office and Retail Fit-Out
Partitions, ceilings, lighting and network infrastructure for commercial spaces.
Frequently Asked Questions
Can you fit out a shop or office outside Turkey?
Yes. We design and manufacture interiors in Turkey and install them in Germany, the Netherlands and other European countries.
How much does a renovation in Istanbul cost?
Costs depend on floor area, scope and material choices. After a free site survey we provide an itemised quotation.
Do I need a permit to renovate?
Interior refurbishment usually does not, but work affecting the structure or façade may require approval — especially near the Bosphorus. We check this during the survey.
Our Process
Discovery & Analysis
Planning & Proposal
Execution & Supervision
Delivery & Support
The Values that Define Us
- Reliability — With more than 30 years of industry experience dating back to 1995, we deliver every project we undertake on time and in full.
- Transparency — With a transparent, dependable and client-focused approach to service, we stand beside you at every stage of process, budget and schedule planning.
- Integrated Service — From turnkey project and execution management to real estate investment advisory, we manage legal, technical and commercial processes under one roof.